Saturday, December 18, 2010
Working Schedule
START: January 10,2011
POST BOARDS: March 4, 2011 (8 weeks)
POST MODEL: March 18, 2011 (+2 weeks)
WEEK 1 (JAN 10) DOCUMENTATION AND CONCEPT
-Program Documentation
-Site Documentation
-Massing Studies
-Conceptual Intent Studies
>Base Documents Done
WEEK 2 (JAN 17) CONCEPT
-Formal Concept Study
>Conceptual Intent Done
WEEK 3 (JAN 24) DESIGN
-Public Circulation
-Curatorial Circulation
-Service Circulation
>Formal Concept Done
WEEK 4 (JAN 31) DESIGN
-Layout Studies
-Site Circulation
-Facade
-Materials
>Massing Done
WEEK 5 (FEB 7) DESIGN
-3D Model
>Layout Done
WEEK 6 (FEB 14) PRODUCTION
-Renderings
-Text
-Board Layouts
>Presentation Outline Done
WEEK 7 (FEB 21) PRODUCTION
-Renderings
-Drawings
>Renderings Done
WEEK 8 (FEB 28) PRODUCTION / DELIVERY
-Drawings
>Drawings Done
>Print, Pack, Post Boards
WEEK 9 (MAR 7)
-Site Model
-Model Material Studies
>Site Model Done
WEEK 10 (MAR 14) PRODUCTION / DELIVERY
>Final Model Done
>Pack, Post Model Done
POST BOARDS: March 4, 2011 (8 weeks)
POST MODEL: March 18, 2011 (+2 weeks)
WEEK 1 (JAN 10) DOCUMENTATION AND CONCEPT
-Program Documentation
-Site Documentation
-Massing Studies
-Conceptual Intent Studies
>Base Documents Done
WEEK 2 (JAN 17) CONCEPT
-Formal Concept Study
>Conceptual Intent Done
WEEK 3 (JAN 24) DESIGN
-Public Circulation
-Curatorial Circulation
-Service Circulation
>Formal Concept Done
WEEK 4 (JAN 31) DESIGN
-Layout Studies
-Site Circulation
-Facade
-Materials
>Massing Done
WEEK 5 (FEB 7) DESIGN
-3D Model
>Layout Done
WEEK 6 (FEB 14) PRODUCTION
-Renderings
-Text
-Board Layouts
>Presentation Outline Done
WEEK 7 (FEB 21) PRODUCTION
-Renderings
-Drawings
>Renderings Done
WEEK 8 (FEB 28) PRODUCTION / DELIVERY
-Drawings
>Drawings Done
>Print, Pack, Post Boards
WEEK 9 (MAR 7)
-Site Model
-Model Material Studies
>Site Model Done
WEEK 10 (MAR 14) PRODUCTION / DELIVERY
>Final Model Done
>Pack, Post Model Done
Labels:
schedule
Saturday, December 11, 2010
Due Dates
Postmarked by:
MARCH 4: Boards/A3 Printouts/CD
MARCH 18: Model
MARCH 4: Boards/A3 Printouts/CD
MARCH 18: Model
Labels:
requirements,
schedule
Mänttä-Vilppula
Mänttä-Vilppula, closest town to site (3km to the east of site).
Wikipedia:
Mänttä-Vilppula (Swedish: Mänttä-Filpula) is a town and municipality of Finland. The municipalities of Mänttä and Vilppula were consolidated into a single municipality on January 1st, 2009. It is located in the Pirkanmaa region.
The town has a population of 11,510 (31 March 2010)[2] and covers an area of 657.1 square kilometres (253.7 sq mi) of which 122.61 km2 (47.34 sq mi) is water.[1]
The municipality is unilingually Finnish.
Major lakes in the area include the lakes Ruovesi, Kuorevesi and Keurusselkä.
Wikipedia
http://www.manttavilppula.fi/
Wikipedia:
Mänttä-Vilppula (Swedish: Mänttä-Filpula) is a town and municipality of Finland. The municipalities of Mänttä and Vilppula were consolidated into a single municipality on January 1st, 2009. It is located in the Pirkanmaa region.
The town has a population of 11,510 (31 March 2010)[2] and covers an area of 657.1 square kilometres (253.7 sq mi) of which 122.61 km2 (47.34 sq mi) is water.[1]
The municipality is unilingually Finnish.
Major lakes in the area include the lakes Ruovesi, Kuorevesi and Keurusselkä.
Wikipedia
http://www.manttavilppula.fi/
Subscribe to:
Posts (Atom)